WALTHAM POOL

BRIEF

We were contracted to for the repair and revamp of the Waltham Pool.  This project was on a very tight deadline for the pool to re-open in January 2015.  Our scope was completed in around 2 weeks with various repairs and a super fast turn around of over 2000m2 of Exposed Aggregate Concrete.

PRODUCTS

  • Exposed Aggregate Concrete
  • Plain Concrete

INSTALLATIONS

  • Concrete Floors
  • Walkways
  • Steps
  • Pool Surround
  • Drainage Dish Channels
  • Pool Repairs
  • Footings and Earthquake Strengthening