WALTHAM POOL
BRIEF
We were contracted to for the repair and revamp of the Waltham Pool. This project was on a very tight deadline for the pool to re-open in January 2015. Our scope was completed in around 2 weeks with various repairs and a super fast turn around of over 2000m2 of Exposed Aggregate Concrete.
PRODUCTS
- Exposed Aggregate Concrete
- Plain Concrete
INSTALLATIONS
- Concrete Floors
- Walkways
- Steps
- Pool Surround
- Drainage Dish Channels
- Pool Repairs
- Footings and Earthquake Strengthening